One of ACE’s longest running partnerships is with the Grand Canyon National Park. This past summer and in to the fall ACE crews worked on several of the many trails in and around the canyon.
ACE had two crews working on two different trails in the canyon, the Bright Angel and the Hermit trail. The crew on Bright Angel was led by ACE crew leader, Hannah Baskin and the Hermit trail crew was led by ACE crew leader, Stephanie Gonzales. Both of these trails experience heavy foot traffic in the summer months. In addition to hikers, the Bright Angel trail also supports mules tours as well as pack mules throughout the year.
Both crews were performing cyclical maintenance on the trails. This usually encompasses widening tread, clearing drains, reinforcing water bars, brushing and clearing the trail of any obstacles. The canyon trails require attention all year long because of the constant erosion that happens within the canyon walls.
On the Bright Angel trail the crew was performing general maintenance as well as assisting the National Parks Service trail crew with a rock work project. Some of the crew members were on patrol to make sure that hikers were safe while the work was being completed and other crew members got to try their hand at the rock drill.
On the Hermit trail the crew was using a grip hoist to move some large boulders from the trail. Using rock bars the crew was able to move boulders out of the main trail and repair parts of the trail that were eroded by flooding.
Going into the fall ACE crews will continue working further down the Bright Angel Trail and eventually to Phantom Ranch at the bottom of the canyon. Our staff and corps members continue to feel grateful that they are able to serve in and contribute to the protection of this park.